Bathroom Remodel Step by Step: A Real Aspen Hill, MD Project

A full bathroom remodel usually follows the same steps: plan the design, take the room down to the subfloor, update the plumbing and electrical, build and waterproof the shower, tile, paint, and install the fixtures. Below, we walk through each step using real photos from a bathroom we remodeled in Aspen Hill, MD, so you can see what happens behind the walls before the finished room comes together.

The Project at a Glance

  • Location: Aspen Hill, MD (Montgomery County)
  • When: August 2023
  • Scope: full bathroom remodel, taken down to the subfloor
  • New features: white shower base with a linear drain, large white shower wall tile, large gray floor tile, sliding glass shower doors, handheld shower on a slide bar, pedestal sink, one-piece toilet, four-light fixture and mirror

You can see the full photo set on our Aspen Hill bathroom remodel project page.

Step 1: Plan the Design and Budget

Every remodel starts with decisions: the shower or tub layout, tile, vanity or sink, toilet, lighting and finishes. This is also when the budget is set and any permits are planned, since work that changes plumbing or electrical usually needs one in Montgomery County. Making selections early keeps the job moving, because special-order items like glass doors can take time to arrive. For typical prices, see our bathroom remodel cost guide.

Step 2: Demolition Down to the Subfloor

In this Aspen Hill bathroom, we took the room down to the plywood subfloor with the plumbing exposed. Opening everything up is the only way to see the condition of the subfloor, framing and pipes, and to fix any hidden water damage before new finishes go on top.

Aspen Hill, MD bathroom mid-remodel, opened to the plywood subfloor with plumbing exposed and shower base set

Step 3: Plumbing and Electrical Rough-In

With the room open, the plumbing for the shower, sink and toilet is set in the right places, and wiring for lights and outlets is updated. If a permit is required, this is usually when the rough-in inspection happens, before anything is covered up.

Step 4: Set the Shower Base and Waterproof

For this bathroom, we set a white shower base with a linear drain. A linear drain is a long, narrow drain along one edge of the shower. It’s easy to step over, it lets water run off in one direction, and it gives the shower a clean, modern look. Behind the tile, a proper waterproofing system is what really protects the house, because grout and tile alone are not waterproof.

Step 5: Backer Board and Tile

Next, we screwed down backer board and laid large gray rectangular floor tile in an offset pattern, then tiled the shower walls in large white tile. Large tile has fewer grout lines, which makes a small bathroom look bigger and makes cleaning easier. Not sure which tile to choose? Read porcelain vs ceramic tile for bathrooms.

New gray floor tile and freshly painted light gray walls, before the fixtures went in

Step 6: Paint and Trim

Once the tile was in, we patched and painted the walls light gray and added white baseboards. Painting before the fixtures go in is faster and gives cleaner lines around the sink, toilet and mirror.

Step 7: Install Fixtures and Glass

Finally, we installed sliding glass shower doors with chrome hardware, a handheld shower on a slide bar, a white pedestal sink with a chrome faucet, a one-piece toilet, a four-light fixture with white glass shades and a mirror.

Aspen Hill, MD bathroom after remodel with sliding glass shower doors, pedestal sink and one-piece toilet

Step 8: Final Walkthrough

At the end, the homeowner and project manager walk through the finished bathroom together, test every fixture, and make sure everything is right before the job is closed out.

Why These Choices Work in a Small Bathroom

  • Glass doors instead of a curtain keep the room open and let light reach the whole space.
  • A pedestal sink takes up less floor space than a full vanity, which helps in a tight room.
  • A one-piece toilet has fewer seams, so it’s easier to clean.
  • A handheld shower on a slide bar adjusts for different heights and makes rinsing and cleaning easier. It’s also a smart aging-in-place feature.
  • Light walls and large white wall tile make the room feel brighter and bigger.

Shower with large white wall tile, a handheld shower on a slide bar and sliding glass doors

For more ideas, browse our small bathroom remodel ideas, or see whether a rain shower head is worth it for your new shower.

Frequently Asked Questions

What are the steps of a bathroom remodel?

Plan the design and budget, demolish down to the subfloor, rough in plumbing and electrical, set the shower base and waterproof, install backer board and tile, paint and trim, install fixtures and glass, and finish with a final walkthrough.

How long does a bathroom remodel take?

It depends on the size of the bathroom and what’s changing. Read how long a bathroom remodel takes for a typical Maryland timeline.

Do I need a permit to remodel my bathroom in Montgomery County?

If the work changes plumbing or electrical, a permit is usually required. A licensed contractor should handle the permits and inspections for you. Learn more in do you need a permit to remodel in Montgomery County.

Planning a Bathroom Remodel in Aspen Hill or Nearby?

Real Time Home Improvement is a licensed (MHIC #162705), insured and bonded home improvement contractor with 10+ years of experience remodeling bathrooms in Aspen Hill, Rockville, Silver Spring and across Montgomery County. See our bathroom remodeling in Aspen Hill page, browse more of our work, or request your free estimate. You can also call us at (240) 485-8797.